Tennessee sizes every LPP field with the same two-step arithmetic, and you can do it on the back of an envelope once you know your soil rate.
Start with design flow. Tennessee assumes 150 gallons per bedroom per day for alternative systems, so a 3-bedroom house is designed for 450 gallons a day, whatever your water bill says. Next, the soil consultant's extra-high-intensity soil map gives the soil an absorption rate in minutes per inch (mpi). The rule turns that into a loading rate: how many gallons each square foot of field can take per day. Divide the flow by the loading rate and you have the field area. Divide the area by 5 and you have the feet of trench.
Say your soil maps at 45 minutes per inch. The loading rate is 0.275 gallons per square foot, so 450 gallons needs about 1,640 square feet of field, or roughly 330 feet of trench. Since no single lateral can run past 100 feet without an engineer, that's at least four trench runs. Then you need the same amount of good ground again, untouched, as the duplicate (reserve) area for a replacement field someday.
Slow soil changes the picture fast, as the table shows. This is the main reason two LPP quotes on two different lots can be thousands of dollars apart.
Loading rates are from Table II of Tennessee's LPP rule; the areas and lengths are our arithmetic for a 450-gallon-a-day design and leave out the duplicate area. Your designer may add buffer zones on a long slope.